During the construction phase of a steel frame home, the process begins with site preparation, including excavation and foundation work. Once the foundation is in place, the pre-engineered steel components are delivered and assembled, forming the skeletal structure of the home. With the frame assembled, the installation of other building systems, such as electrical, plumbing, and insulation, takes place. Exterior and interior finishes are then added, including walls, roofing, flooring, and fixtures. The construction phase concludes with thorough inspections to ensure compliance with building codes and quality standards.